top of page
Beach Road, Selsey
DETAILS:
Project: Attenuation Tank & Flow Control Chamber
Project Background:
Southern Water Identified the need for an upgraded attenuation system to mitigate flooding in the Beach Road, Selsey area. This project aimed to enhance the local sewer network's storage capacity through the construction of a new attenuation tank and flow control chamber.
Project Scope:
Attenuation Tank Construction:
Construction of a reinforced concrete structure, including base, Installation of a polypropylene attenuation tank, walls, and roof with access. In addition, Impact were also required to construct a new precast concrete Flow Control Chamber downstream of the Attenuation Chamber.
bottom of page